Rental laws by state

Does a QLD rental need a safety switch?

Queensland

90 days

Install an approved safety switch for every power point circuit within 90 days after a tenancy starts

Western Australia

Before each tenancy

Residual current devices (safety switches) must be properly installed before a new tenancy

Checked by our team on 22 November 2026. General information only, not legal advice. Always check the authorised version before relying on it.